    Window Replacement at Franklin High School, John F. Kennedy
    Elementary School and Davis Thayer Elementary School
    Franklin, MA


    Project Scope:

    Remove existing windows and & install new energy efficient aluminum windows. The existing window systems were very susceptible to air and water infiltration and were difficult to operate. Both in-swing operable units and double hung systems were installed. The work included hazardous materials abatement and concrete sill repairs. Work was completed in 2004.

    Project Cost: $659,500