    Roof Replacement at Greenlodge Elementary School


    Project Scope: Remove 20,000 sf of built-up roof system & replace w/ new 4-ply cold process built-up roofing system.

    Complex project requiring removal of 2 to 3 different roofing systems down to the structural deck, replaced numerous quantities of deteriorated wood deck, abandoned various rooftop units and skylights. Complex tapered insulation system required adding new drains. Design also called for new throughwall flashing at masonry walls to provide proper flashing height. Very tight time frame met, such that all work was done before school started in September.
    Project Cost: $217,000


    [Home] :: [Project Illustrations] :: Greenlodge Elementary School


    check out our current projects




    Click to enter site

    Copyright 2002-2005 Russo Barr Associates, Inc.
    Burlington, Massachusetts
    tel: 781.273.1537
    fax: 781.273.1695