PUBLIC FAÇADE PROJECTS


Card image cap
Building Envelope Repair Project Butler Elementary School

The project included repairs to deficient conditions that existed in the exterior wall construction which led to...

  • Belmont, MA
  • $895,000
Card image cap
Masonry Restoration Project Brookline High School

The goal was to address masonry façade issues. The project included masonry repointing...

  • Brookline, MA
  • $890,000
Card image cap
Masonry Restoration Project Three Public Schools

The project included masonry repointing, structural steel lintel repairs, brick replacement, stair replacement, replacement of sealant joints...

  • Brookline, MA
  • $1.09M
Card image cap
Masonry Restoration Project Capen Elementary School

The project scope included repair of deteriorated masonry, architectural precast elements...

  • Dedham, MA
  • $490,000
Card image cap
Masonry Restoration Project Dedham High School Girls Gym

This project consisted of the repair of the significantly deteriorated masonry and back-up...

  • Dedham, MA
  • $336,000
Card image cap
Masonry Restoration Project Albert N. Parlin Elementary School

Work included repairs to deficient exterior masonry wall...

  • Everett, MA
  • $1.5M
Card image cap
Building Envelope Repair Project at Franklin Public Library

The work for this project involved the repair of the historic building. Work included...

  • Franklin, MA
  • $400,000
Card image cap
Masonry Restoration Project Hopkinton Middle School

The work included extensive masonry wall restoration. Large sections of wall areas were...

  • Hopkinton, MA
  • $250,000
Card image cap
Masonry Wall Flashing Repairs & Concrete Structural Repairs Norton Middle School & Yelle Elementary School

The project consisted of...

  • Norton, MA
  • $910,000
Card image cap
Building Renovation Project Boston Fire Department Engine 50

The work consisted of replacing existing historic slate roof with...

  • Charlestown, MA
  • $3.5M
Card image cap
Exterior Envelope Restoration Project Town of Weston Old Library

The work for this project involved the stabilization and restoration of the historic Weston...

  • Weston, MA
  • $546,900
Card image cap
Masonry Restoration Project Fletcher Maynard Academy School

The project included 100% masonry repointing, structural steel lintel replacement, structural...

  • Cambridge, MA
  • $850,000

Please contact us concerning your building envelope consulting needs, for both on-going or prospective projects.

Get in Touch

©2018 Russo Barr Associates.